The prime contractor is contracted by the end customer. Sub-contractors are contracted by the prime contractor or other sub-contractors.
The customer pays the contractor, and the contractor pays the sub-contractor. The sub-contractor does the work but the contractor remains responsible for ensuring that the work is done prompptly and correctly. The contractor ensures that all legal requirements for the work are met, and that the sub-contractor hasan appropriate amount of liability insurance, in the event that something goes wrong and horrible law suits result.
what is the difference between an assembler and the translator
what is the difference between license and patent
What is difference between hvac and ahu
Yes, a principal contractor can be vicariously liable for the actions of his subcontractor if the subcontractor is found to be an agent of the principal contractor. This typically occurs if the subcontractor is under the direct control or supervision of the principal contractor in carrying out the work.
a bidder is a contractor or supplier,but, .......
A residential contractor specializes in building homes which people will live in. A building contractor oversees the building of commercial property.
The main difference between a property developer and a building contractor is the developer is the person who blueprints the area and buys the land to build on. The contractor is the person who actually builds the building or subcontracts the work out.
There's no resemblance whatsoever between the general contractor and the Project Manager in job functions.
The prime contractor is contracted by the end customer. Sub-contractors are contracted by the prime contractor or other sub-contractors.
The question is about as clear as mud. Is the contractor an individual or an incorporated business? Does "principal" refer to the owner of the company? Is the contractor, the business, and the principal, all the same person? Re-word and re-submit - in plain English please.
PRINCIPAL ARGUMENT = ARGUMENT + 2nPI arg(Z) = Arg (Z) + 2nPI
The four main parties involved in enforcing the CDM (Construction Design and Management) regulations in the UK are the client, the principal designer, the principal contractor, and the contractor. The client is responsible for appointing competent individuals and ensuring compliance. The principal designer manages health and safety during the design phase. The principal contractor oversees health and safety during the construction phase. The contractor carries out the construction work.
Wavlength
i dont know.hahahah..
A general engineering contractor is a contractor whose principal contracting business is in connection with fixed works requiring specialized engineering knowledge and skill, including irrigation, drainage, water power, water supply, flood control, inland waterways, harbors, docks and wharves, shipyards, roadways, airports, bridges, etc. A general building contractor simply builds buildings.