During a genome assembly, "contiguous sequences of nucleotide bases" (contigs) are built from the multi-alignment of highly similar single reads.
After the alignment step, multiple consensus sequences of all aligned or assembled reads are obtained which represent the contig sequences of a given genome or assembly. In contrast, a scaffold is an ordered set of contigs which are linked by sequences that were derived from the paired-end information of long paired-end libraries (Roche) or mate-pair libraries (Illumina).
Scaffolds always consist of contigs separated by gaps. These gaps might be identified by "NNNN" in a consensus sequence
Ref: http://www.eurofinsdna.com
B. Wajid
She enjoys doing 'spot the difference' puzzles.There is a difference between happy and sad.What is the difference between these two cakes?
what is the difference between ERD and UML Flowcharts.
what is the difference between commutative and symmetric properties
Light duty
difference between physical and logical data flow diagrams.
A contig is a group of DNA segments that overlap and represent a consensus region. It also refers to the clones that overlap and form a map of genome.
Heavy duty scaffold is required for holding brick or cement blocks while bricklaying. Scaffolding is rated in terms of pounds per square foot (lb/sq*ft). There are three ratings: heavy (75), medium (50) and light (25) duty. You should only load scaffolding to 1/4 of their rating. You multiply the rating by the surface area of the plank inside the scaffold and divide by four. For example, a bricklayer is using a heavy-duty scaffold that holds a 6X2 foot platform inside the framework. This scaffold should hold no more than 6x2x75/4 = 225 Lb. of bricks at any time. Please improve this answer by adding how You know the difference in scaffolds just by looking.
Scaffold
scaffold is a noun so there is no antonym.
1.Cantilever scaffold 2.Suspended scaffold 3.Single pole scaffold
The Linear Scaffold was created in 1997.
Someone trained in scaffold inspection.
rule of thumb; 1m3 of scaffold = 30kg 1tonnes = 1,000kg for 1 tonnes of scaffold : (1,000 / 30) = 33.3333m3 Answer; approx. 33m3 (cubic meter) of scaffold for 1 tonnes.
In the period between the two scaffold scenes, Dimmesdale admits his sin and guilt to his parishioners from the pulpit. He confesses his hypocrisy and acknowledges that he is the father of Pearl. This public confession marks a turning point in the novel.
A scaffold that is supported by tube and fit fixed to a solid structure
What is the height of a scaffold if the person is 6ft. Tall?
Scaffold spanners can be found online at various auction sites. Also, they can be found at scaffold specialty stores that are also easily accessible online.