There are a great many. but to keep it simple:
(a) pressure-testing the cables/switchgear/Transformers/etc. (i.e. testing the insulation using high-voltage test sets);
(b) testing the operation of the switchgear;
(c) testing the operation of the protective relays.
...but lots more.
Chat with our AI personalities
Depending on the equipment required for the substation,some of the tests are as follows: meggering,hi-pot testing,continuity checks,c.t. testing,relay testing,ngr testing, capacitance bridge test's on transformers.
The lead Engineer is the person with innovations from Mathematical models so that the Technologists can implement it.
Systems Commissioning is the process of testing final versions of software, hardware and configuration in their final locations. Once completed, it is "Live" (Available for use) and will not require further testing.
i can change my password cso
Testing and wiring should be carried out by a qualified , trained technician / engineer so that the electrical devices and wiring are properly done with safety.