The main charcteristics of top down projects are:
On the other hand bottom up projects are usually
Bottom up- a man feels a something crawling on his arm and, without seeing it, freaks out . Top down- a man sees a spider and stomps on it because of his past experiences with spiders. Bottom up deals more with assumptions and creating a circumstance due to expectancy while Top down, on the other hand, is more of a thought out process due to knowledge. The man in the bottom up example expected that a spider would be the cause of the sensation on his arm and so reacted. The man in the top down example reacted because, based upon fact not expectancy, he knew a spider was nearby.
As an example: If you were implementing a new process or procedure in a company; Top Down would start with the Board of Directors/owners and make its way DOWN through the management to the shop floor staff. Bottom Up would start at the shop floor staff and move through supervisery, to manager s to senior managers etc
The style is a long, necklike tube that leads down to the ovary. The stigma is the opening at the top of the pistil.
You should not self-harm in any way, as it can lead to serious physical and mental health consequences. Seeking professional help and emotional support is crucial in managing and overcoming distressing thoughts and feelings.
The terminal button is typically located at the top or bottom of the terminal window depending on the software you are using. It is often labeled with the word "Terminal" or an icon representing a command line interface.
the top is the giver while the bottom is the receiver
Top-down approaches start with a broad overview and then break it down into smaller details, while bottom-up approaches start with specific details and build up to a broader understanding.
We should eat more products from the bottom and from the bottom to the top goes graduation of eating products more rare. the top is the least healthy.
In top down planning the marketing strategy of the store flow from the higher authority to the lower one, and in bottom up planning all the planning strategy of the store is done by the store manager with the joint contribution of his store employee's.
The top-down process generates ideas of a broader, more strategic nature, whereas the bottom-up process generates ideas of a more project-specific nature.
one side shoots out flames
Top down Program Design : Begins the design with main or top-level module, and progresses downwards to the lowest level modules or subsystem Bottom down Program Design : Begins the design with the lowest level modules or subsystems, and progresses upward to the main program, module or subsystem.
The difference between the top mark and the bottom mark is 1 quart. When thel level gets down to the bottom mark, add a quart of Mercon ATF.
there the same
A vertical angle runs up and down or from top to bottom or vise versa. A horizontal angle runs from left to right or vice versa.
To explain simply, think of a fraction. There is a number (in simple cases) on top and a number on the bottom. The numerator is the top number, the denominator is the bottom one. An easy trick I used to remember is that d is for down- denominator goes down. Though probably not as useful, numerator has a u in it, to represent up. Hope this helps!
The foot would be the base, or bottom, and the summit would be the peak, or top.