the control measure is the condition that controls a hazard.

the monitoring procedure is the recording to make sure the safe levels are not exceeded

User Avatar

Wiki User

12y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is the difference between a control measure and a monitoring procedure?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is different between control measure and a monitoring procedure?

the control measure is the condition that controls a hazard. the monitoring procedure is the recording to make sure the safe levels are not exceeded


What is the difference between feedback and control?

difference between feedback and control


What is the difference between near and far procedure in 8086 microprocessor?

Near calls and returns transfer control between procedures in the same code segment. Far calls and returns pass control between different segments.


In a HACCP system what is the difference between a control measure and a monituring procedure?

The control measure is the condition or parameter that controls a hazard. For example, refrigeration under 38°F will control the growth of C. botulinum in vacuum-packaged smoked salmon.The monitoring procedure is the system whereby the conditions are recorded to make sure the limits for controlling the hazard are not exceeded. For the vacuum-packaged smoked salmon, that could be a continuous recording thermometer and/or a manual temperature log. For temperature monitoring, that would include time frames, since hazards related to temperature always have associated time frames.


What is the difference between Project Monitoring and Project Control?

Monitoring - collecting, recording, and reporting information concerning project performance that project manger and others wish to know Controlling - uses data from monitor activity to bring actual performance to planned performance


What is the difference between SQC and SPC?

SQC or statistical quality control is concerned with using the 7-QC and 7-SUPP tools to monitor process outputs. Statistical process control, or SPC is concerned with monitoring the inputs of the process.


What is Difference between process control and product control?

Process control deals with the specific process algorithms, architecture, and mechanisms in engineering production to keep a specific output. Product control is used in banking at trade desks for doing accounting and reporting, monitoring, and maintaining the activities of trading portfolios.


What is the major difference between control process and process control?

Difference between control process and process control is that system control process is typically the large scale version of where process control is used.


What is the difference between inventory control and inventory planning?

Their is no Difference


What is the difference between strategic control and financial control?

Define staregic control and financial control


Difference between coordination and control mixed?

differentiate coordination and control


Statistical process control?

Explain the difference between capability and control.