answersLogoWhite

0

Any where from 15.00 per square meter up to $50.00 per square meter.

Thus for a 3000 Square Meters [13mm polyurethane surface] 3000 square meters can cost $150,000.00. The more surface area and higher quality materials may cost more.

User Avatar

Wiki User

12y ago

Still curious? Ask our experts.

Chat with our AI personalities

FranFran
I've made my fair share of mistakes, and if I can help you avoid a few, I'd sure like to try.
Chat with Fran
CoachCoach
Success isn't just about winning—it's about vision, patience, and playing the long game.
Chat with Coach
DevinDevin
I've poured enough drinks to know that people don't always want advice—they just want to talk.
Chat with Devin
More answers

The cost to surface a track can vary depending on the type of surface being used and the area you are located in. On average, it can range from $10 to $50 per square meter for materials and labor. Additional costs may be incurred for site preparation and maintenance.

User Avatar

AnswerBot

10mo ago
User Avatar

Add your answer:

Earn +20 pts
Q: How much does it cost per square meter to surface a track?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Natural Sciences

If carpet costs 9.99 a square yard how much would a square meter cost?

To convert square yards to square meters, multiply by 0.8361. Therefore, a square meter of carpet would cost approximately $11.91 (9.99/0.8361).


How much a square meter of concrete?

The cost of a square meter of concrete can vary depending on factors such as the type of concrete mix, local market conditions, and any additional labor or delivery costs. On average, the price can range from $75 to $150 per square meter. It is recommended to obtain quotes from local suppliers for an accurate estimate.


How do you work out cleaning services per person per square meter?

To work out cleaning services per person per square meter, you would first determine the total cleaning cost for the space based on square meters. Then, divide this cost by the number of people to get the cost per person. This calculation helps in evenly distributing the cleaning cost among the individuals utilizing the space based on their impact on cleanliness.


0.75 meter of chain at 4.80 per meter?

The total cost for 0.75 meters of chain at $4.80 per meter would be $3.60. This is calculated by multiplying the length of chain (0.75 meters) by the cost per meter ($4.80).


How much material for a triangular sail cost if the material cost 15.95 per square meter and the sail is 21.7 meters high and the base is 15.9 meters long?

The area of a triangle is calculated as (base x height) / 2. In this case, the area of the triangular sail would be (15.9 x 21.7) / 2 = 344.43 square meters. Multiply this by the material cost of $15.95 per square meter to find the total cost, which would be $15.95 x 344.43 = $5497.77.