The Production Budget for Paranormal Activity 2 was $3,000,000.
The Production Budget for Paranormal Activity 4 was $5,000,000.
The Production Budget for Back to the Future Part III was $40,000,000.
authorization bill
code
01
a budget which is prepared for one level of activity is:
The Production Budget for Paranormal Activity 2 was $3,000,000.
The Production Budget for Paranormal Activity 4 was $5,000,000.
The budget that is prepared for one level of activity is known as a static budget. A static budget is often one of many other budgets that are created off of a master budget.
The Production Budget for Back to the Future Part III was $40,000,000.
The Production Budget for Source Code was $32,000,000.
The Production Budget for Code 46 was $7,500,000.
The Production Budget for The Omega Code was $7,200,000.
Fixed or Static buget is for a particular activity level. Flexible budget is for a range of activity level. Differentiate between Fixed and Flexible budget ? Needs a complete answer.
SALES
Rigid Budget: It does not change with actual volume of activity achieved. Thus it is known as a Rigid or inflexible budget.