answersLogoWhite

0


Best Answer

New Nuclear plants continue to be built across the the world all the time. Here in the United States, it has become a political Propaganda tool by some political groups who care nothing for what their stated goals are, but only for the leverage the subject can give them as a political power issue. This, along with safety concerns after the Three Mile Island accident, has led to a virtual halt to new nuclear plant construction here in the U.S., and an increase in coal and oil fired power plants that add to greenhouse gases and global warming. The rest of the world isn't quite as ignorant though.

Japan is a good example of a country that gets most of its electricity from Nuclear Power. The only country where nuclear weapons have been used offensively, Japan uses Nuclear Power as their primary source of electricity. Japan is the 2nd largest user of Nuclear Power in the world. Though some incidents there have led to some construction slowdowns, new plants are still a priority for them.

User Avatar

Wiki User

15y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: When was the last nuclear power plant built?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the name of the nuclear power plant built in 1979?

The last plant built in the US began construction in 1977. That's the "River Bend" plant in Lousiana.


When was the last nuclear power plant built in Georgia?

The last nuclear power plant built in Georgia, USA, was the Alvin W. Vogtle facility in Burke county, Georgia. It is a two unit Westinghouse PWR, completed in 1987 (Unit I) and 1989 (Unit II), rated 1215 MWe each. There are no nuclear power plants in Georgia, the country.


When and where was last nuclear reactor built?

The last nuclear reactor has not been built yet.


How many nuclear power plants do you have in the us that are active?

No new nuclear plants have been built in the US in the past 20 years. The Watts Bar plant was licenced in 1996, but had been built much earlier. The last plant actually built was the River Bend plant in Louisiana, which was licenced in 1986.


When was the last accident at a nuclear power plant?

Fukushima Daiichi, on March 11, 2011.


When was the last nuclear power plant ordered in the US?

According to the US Dept of Energy, the last reactor built was the "River Bend" plant in Louisiana. Its construction began in March of 1977. The last plant to begin commercial operation is the "Watts Bar" plant in Tennessee, which came online in 1996. Note: The list I obtained only listed operational reactors.


Sentences with the word nuclear?

Nuclear power is one of the ways we can cut back on our reliance on fossil fuels.We have built a nuclear bomb and are not afraid to use it.In the modern era, the ideal family unit is what sociologists call the "Nuclear Family".I seem to have misplaced the nuclear launch codes at the bar last night.


How long did it take France to start-up last nuclear power plant?

The last nuclear power plant to start up in France, Flamanville 3, began construction in December 2007 and was initially scheduled to be completed by 2012. However, due to various delays and setbacks, the plant did not enter commercial operation until December 2021.


Is nuclear energy cheaper than other source?

Nuclear energy can be cost-competitive with other sources of energy once the plant is up and running, but the initial capital costs to build a nuclear power plant are higher. The operating costs for nuclear power plants are relatively low compared to fossil fuel sources, which can make it a cost-effective option in the long term.


How long does it take to construct a nuclear power plant?

It depends where. In the U.S., it takes several years, mostly because of all the environmental studies and impact statements, permits and other government paperwork. Also, in the U.S., each one has some level of custom engineering. Also, unions slow down the work considerably. (I would not have made that last statement before I worked with some engineers who had been involved in building a nuclear power plant. They told me that the plumbing, for example, took between 2 - 3 times as long as it would have with non-union plumbers, and there is A LOT of plumbing in a nuclear power plant.)A conventional plant without any site-specific engineering or red tape could be built in less than a year.


When was the last nuclear power-plant failure?

The latest major nuclear power plant failure was the Fukushima Daiichi disaster in Japan in 2011. It was caused by a tsunami triggered by an earthquake, resulting in a meltdown of three reactors and release of radioactive materials. Since then, safety measures and regulations have been strengthened to prevent similar incidents.


Which three regions produce little or no nuclear power?

Three regions that produce little or no nuclear power are Africa, South America, and Southeast Asia. These regions have limited or no operational nuclear power plants due to various reasons such as cost, concerns over safety and environmental impact, or a focus on other energy sources like renewables.