Herbert Hoover didn't build the dam, it was just named in honour of him. The Hoover Dam boarders Nevada and Arizona. The dam was built in order to create jobs during the Great Depression and it succeeded
The Hoover Dam is located on the border between Nevada and Arizona.
boulder dam
Boulder Dam.
Hoover dam (Boulder) was named in honor of Pres. Herbert W. Hoover.
1930
It takes approximately three years of hard work.
Chuck Norris
Hoover dam's width is 201.17 meters.
The Hoover dam weighs 6,600,000 tons. It took 3,250,000 cubic yards of concrete to build the dam itself
Trees
The United States.
Hoover Dam is 1244 ft (379 m) long.
A total of 3,250,000 cubic yards.
black canyon on the Colorado river
To provide the western states with irrigation and electricity-
Can't happen. Beavers work with mud and branches, the Hoover dam is reinforced concrete. Mud and branches makes for a much weaker building material than reinforced concrete. It's impossible to build something to the proportions of the Hoover dam out of mud and branches, it'd collapse under its own weight, or be washed away by the water pressure long before it got anywhere near Hoover dam size.