Best Answer

depending on loads and soil condition a pile type may chosen as suitable for certain conditions. 1.determine ground conditions. 2.determine loads requirement . 3.decide on the pile type. 4.in some cases access may restrict you pile choice. 5.loads cases will be considered 6.pile type,concrete strength,typy of reinforcement. 7.instollation of piles.

User Avatar

Wiki User

βˆ™ 15y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

βˆ™ 14y ago

A pile is more slender than a pier. They are essentially the same thing. The cut off diameter or cross section size for when a pile becomes a pier is unknown. but the pile is far better tha pier because the total masss is divided equally between each pile used in pilefoundation and the foundation is very much stable.

This answer is:
User Avatar

User Avatar

Wiki User

βˆ™ 11y ago

Construction of well foundation

Work is done during non-monsoon months of the year

Islolate the area by making bund around it so that river water flows
beyond the island. Sheet piling is also resorted where bed is
deep

Low height Sand island is created as platform over which cutting edge of steel
for well curb is placed and well curb is cast with some steining height
(may be 1.5 to 3.0m)

Kentelage (load ) is applied through platform at top of steining, cast so far,
to sink the steining and simultaneously dredging of material from inside is resorted.

Keep Casting steining and applying kentelage to sink it.A minium 48 Hrs curing time
is must for steining after its casting for it to be ready for sinking.

Initially the sinking will be faster and inside dredging is easy due to soft top strata
Once steining get sunk deeper, there is enough friction from sides.Dredging from inside will
need effort for sinking it ( before loading it) thru trained divers(with oxygen mask) who go
below and dredge at bottom of steining since river water seeps into well

The process goes on for one or more seasons depending upon depth of sinking.
The sinking process is slow and time taking.Half constructed wells
have to see the flash floods of river when islands and bunds wash away
during monsoon.

Once final level is achieved, well is plugged at bottom with rich concrete as per
drg and specifications.This is bottom plug.

Well upto nearly mid-height is filled with sand(or excavated material free
from organic matter) and again plugged with rich concrete
acting as intermediate plug.

From intermediate plug upto well cap soffit level , the well is filled with
sand/exc material and well cap is cast

This answer is:
User Avatar

User Avatar

Wiki User

βˆ™ 13y ago

Pile foundation can be used in low soil bearing capacity in order to minimize the total deflection of the building.

This answer is:
User Avatar

User Avatar

Wiki User

βˆ™ 13y ago

Depending on the soil, height, weight & size of building. All bridges are put in by friction or to bed rock.

This answer is:
User Avatar

User Avatar

Wiki User

βˆ™ 12y ago

pile foundation is super structure load in the building transfer to the suitable dipper sub soil or rock

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What are the procedure of construction of a well foundation?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the population of Holcim Foundation for Sustainable Construction?

The population of Holcim Foundation for Sustainable Construction is 6.


How do you design mat foundation?

design procedure


What is foundation in construction?

Foundation in construction. The foundation is the structure which supports the rest of the building. In home construction it is the portion, usually under gound, that sits on top of the footing and can be made of either pressure treated lumber, concrete blocks or concrete poured in place. rewrgww5r


What is the procedure to take civil diploma course?

CONSTRUCTION


Geometry would not be used to check a foundation during construction?

false


What is neck column in construction?

In construction a column neck is part of the slab foundation. It is put in place to help stabilize the concrete.


Which procedure to open faculty with qatar foundation?

There is no procedure. Qatar Foundation selects its partners according to the country's human resource needs, the partner's academic standing and its preparedness to become an active participant in achieving the organisation's mission.


What is horizontal and vertical construction?

Horizontal construction is the groundwork (grading, compaction, infrastructure, roadways, etc.) and vertical construction is from the foundation up of the actual structure (homes, apartments, etc.).


Is their a Tyler Perry foundation?

There is a registered business for the foundation but no activity that I can find as of yet. It seems that all of his companies' websites are 'under construction' www.annaya.net


What is well foundation?

Well foundation is the most commonly adopted foundation for major bridges in India. Since then many major bridges across wide rivers have been founded on wells. Well foundation is preferable to pile foundation when foundation has to resist large lateral forces.


What are some examples of construction accounting software?

Some examples of construction accounting software are maxwell systems, FOUNDATION for windows, Computerease, Jonas Construction Software, and Sage 100 Contractor.


What is foundation drawing?

A foundation drawing is used to plan out the first floor of a building. The plan is always shown on a X-Y plane. Foundation drawings are involved in the construction department, art, and geometry.