10 feet.
Chat with our AI personalities
before plcement in any mold with out compction is the fresh concrete. or just after plceing the concrete before initial setting is the fresh concrete.
You should wait a minimum of 28 days before you seal concrete. If you pour your concrete in summer, than a minimum of 14 days is acceptable. If you seal concrete any quicker, there is a chance moisture will be trapped inside.
it has to be tacky!!!!!!!
Imediatly after trowling
That depends on the concrete, as well as weather conditions, and the load the concrete would be subjected to. Concrete gains strength over time and the usual benchmarks are 7 days, and 28 days. At 28 days concrete has usually cured to nearly its maximum strength. For a concrete footing in a residential environment say a deck or home the concrete will usually cure for a minimum of three days before the formwork is removed and the rest of the structure is built. For a commercial or civil project the curing is subject to the engineers discretion.