8.64 cubic yards of cement.
You will need 6.17 cubic yards of cement.
At 4" deep, a 13' x 19' area needs at least 3.05 cubic yards of cement.
You will need 27.6 cubic yards of cement.
You will need a minimum of 7.41 cubic yards.
1.85 cubic yards of cement.
8.64 cubic yards of cement.
You will need 6.17 cubic yards of cement.
1,152 cubic feet.
12.96 yards
This is a volume requiring 11.1 cubic yards of cement.
At 4" deep, a 13' x 19' area needs at least 3.05 cubic yards of cement.
5.93 cubic yards.
Thickness? Do you mean cement or concrete - cement is the binder/adhesive in the concrete.
A 16' x 8' by 4" slab requires 3.56 cubic yards of cement.
13*13*6=1014 yards of cement
You will need 27.6 cubic yards of cement.