answersLogoWhite

0


Best Answer

Otherwise whatever you're going to cast in the mold won't release

from the mold.

User Avatar

Wiki User

10y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Why the inner surface of the mold shall be coated with the grease oil?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the term 'sa2.5'means in sandblasting?

SA 2Thorough blast cleaning: Commercial finish 65% cleanthe surface shall be free from visible oil, dirt and grease, from poorly adhering mill scale, rust,paint coatings and foreign matter. Any residual contamination should be firmly adhering. SA 2.5 Very thorough blast cleaning: Near white metal 85% cleanThe surface shall be free from visible oil, dirt and grease, from poorly adhering mill scale, rust,paint coatings and foreign matter. The metal has a grayish color. Any traces of contaminationshall be visible only as slight stains in the form of spots or stripes. SA 3 Blast cleaning to pure metal: White metal 100% cleanthe surface shall be free from visible oil, dirt and grease, from poorly adhering mill scale, rust,paint coatings and foreign matter. The blasted surface must have a uniform metallic color.


What is the square feet of 26 feet x 54 feet and 10 inches deep?

There are three measures given but the shape is not specified. I shall assume that it is a cuboid (rectangular prism).The total surface area of the shape is 2941.33... square feet.There are three measures given but the shape is not specified. I shall assume that it is a cuboid (rectangular prism).The total surface area of the shape is 2941.33... square feet.There are three measures given but the shape is not specified. I shall assume that it is a cuboid (rectangular prism).The total surface area of the shape is 2941.33... square feet.There are three measures given but the shape is not specified. I shall assume that it is a cuboid (rectangular prism).The total surface area of the shape is 2941.33... square feet.


What is the size of basketball backboards?

The backboard shall be a rectangle measuring 6' horizontally and 3 1/2' vertically. The front surface shall be flat and transparent.www.Basketball.com/nba/rules/rule1.shtml


What features do the gas giants have in common?

All the 8 planets initially after the formation of the solar system were in the form of gas. But later on as the time passed the inner planets cooled down and their surface turned hard. But the remaining 4 planets are in their gaseous state till present. First of all they have got many moons orbiting around them They have got huge gravitational force they are bigger than the inner planets None of their surfaces shall solidify in the future.


What is the size of the court for a Tae Kwon Do contest?

The 8m X 8m area in the inner part of the Competition Area of 12m X 12m shall be called the Contest Area and the outer part of the Contest Area shall be called the Alert Area.


How do you make policemen on doodle god?

First, you must seek your inner balance then configure for the amount of blood needed to kill a policeman. It shall help you tremendously. Your Welcome.


Vacuum dewatered flooring?

This specification defines the material, mixing, placing, curing, constructional and other performance requirements for VACUUM DEWATERING CONCRETE SYSTEM for foncrete floor slab. Any other special requirements shown or noted on the drawings and directed by the Engineer-in-Charge shall govern over the provision of this specification. Actual work shall be Carrie out in accordance with this specification and in consultation with specialised firm undertaking the job to suit specific requirement at site such as rise and fall of the floor slab, providing dowels for pedestals etc. In case of conflict between clauses mentioned in this specification and those in any Indian Standard, this specification shall grown. MATERIAL: All materials of construction like cement, aggregatre, sand, water etc. GRADE OF CONCRETE: Minimum grade of concrete used shall be M15 conforming to IS-456. Only Design Mix Concrete shall be used. For other details like proportioning, batching, mixing, placing, curing etc. WATER SCOPE: This specification defines the material, mixing, placing, curing, constructional and other performance requirements for VACUUM DEWATERING CONCRETE SYSTEM for foncrete floor slab. Any other special requirements shown or noted on the drawings and directed by the Engineer-in-Charge shall govern over the provision of this specification. Actual work shall be Carrie out in accordance with this specification and in consultation with specialised firm undertaking the job to suit specific requirement at site such as rise and fall of the floor slab, providing dowels for pedestals etc. In case of conflict between clauses mentioned in this specification and those in any Indian Standard, this specification shall grown. MATERIAL: All materials of construction like cement, aggregatre, sand, water etc. GRADE OF CONCRETE: Minimum grade of concrete used shall be M15 conforming to IS-456. Only Design Mix Concrete shall be used. For other details like proportioning,batching, mixing, placing, curing etc. WATER-CEMENT RATIO: Water-cement ratio upto 0.65 shall be allowed to obtain better slumb & workability. Actual ratio shall be decided with approval of the Engineer-in-charge. Only measured quantity of water shall be used in the mix. SPECIAL REQUIREMENT: All works covered by this specification shall be crried out by an experienced agency having sufficient expertise in vacuum dewatering concrete system. Only skilled and experienced operators shall be employed for the purpose. Prior approval of the agency shall be obtained from the Engineer-in-Charge before starting the work. All the equipment shall be of approved and proven types and suitable for the work involved. CONCRETE LAYING: Concrete laying pattern shall be decided in consultation with the Engineer-in-Charge and with his approval. The maximum width of a slab strip shall not generally exceed 4 metres and minimum number of construction joints shall be used. Alternate slab strips shall be sequentially laid. Any damage to the already finished top surface shall be avoided. At construction joints no overflow of mortal or slurry on the already hardened surface shall be allowed while concreting the intermediate slab strip. Such construction joints shall be marked with a thread in a straight line while the concrete is still green. Continuity of reinforcement shall be maintained while laying concrete in slab strips. Edges at expansion joints shall be protected and proper arrangement of shear-transfer shall be provided standards. CONCRETE COMPACTION: After placing concrete in position, it shall be vibrated thoroughly using poker/needle vibrators and thereafter leveled with surface vibrators to produce a homogeneous and smooth concrete surface. In order to achieve a smooth surface to the satisfaction of the Engineering-in-Charge, surface vibrators shall be very carefully used by skilled operators. Over vibration resulting in excess mortar near the surface shall be avoided. DE WATERING: Suction mats shall be spread over the leveled fresh concrete surface and shall be connected by suction hose to the vacuum pumps for De-watering of surplus water in the concrete. During De-watering it shall be ensured that no cement/cement slurry is pumped out. FLOATING & TROWELING: This shall be done after De-watering by using skim floater(power floater. After this, surface shall be troweled with minimum two passes of power trowel to achieve a wear resistant surface to the satisfaction of the Engineer-in-Charge. CURING: However, all care shall be taken to avoid any stain any permanent stain on the surface. Any stain or permanent marking on the top surface shall be removed by approved means. APPROACH WORKING PLATFORM & FORM WORK: The Contractor shall arrange all arrange all approaches, scaffolding, working platforms etc. for carrying out the entire operation safely and in a work-man-like manner. The working area shall be nearly maintained and all the facilities required by the Engineer-in-Charge for proper supervision of the work shall be provided. TESTING OF FINISHED FLOOR: Contractor shall arrange for core cutting and testing of finished concrete over and above other field tests. Cores shall be taken after 28 days of concreting and tested as per relevant IS Codes. Core test results shall be compared with the normal cube test results taken from the same concrete. The average compressive strength of cores shall be minimum 40% higher than that of normal cube (15cm x 15cm x 15xm) test results. Minimum three cores for each day's work in the initial stages and as decided later by the Engineer-in-Charge shall be taken. The floor shall be properly rectified after cutting the cores with concrete of same mix using the same cement as earlier used and finished smoothly to match with the existing surface. The cut surface of the floor-concrete shall be coated with proper epoxy-based bonding compound before laying concrete to avoid shrinkage cracks or, alternatively, a non-shrink compound shall be added with concrete. PAYMENT: This clause shall apply to Item Rate tender only. Payment shall be made on cubic meter(m3) basis of actually finished work or as calculated from the approved construction drawings, whichever is less. The reinforcement used shall be measured and paid separately on weight basis. If you need Vacuum De-watering concrete flooring job work you can contact us:


What is the official measures of basketball boards?

According to NBA Rules, Section 2:" a. The backboard shall be a rectangle measuring 6' horizontally and 3 1/2' vertically. The front surface shall be flat and transparent.b. A transparent backboard shall be marked with a 2" white rectangle centered behind the ring. This rectangle shall have outside dimensions of 24" horizontally and 18" vertically. "


What is the future of was?

I shall be You shall be He/She shall be We shall be You shall be They shall be


The top of a ladder must extend how many feet above the surface a worker is climbing onto?

From the US OSHA Construction standards:1926.1053(b)(1)When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.


Basketball backboard size and height?

According to NBA Rule 1, Section II, articles (a & b): a. The backboard shall be a rectangle measuring 6' horizontally and 3 1/2' vertically. The front surface shall be flat and transparent. b. A transparent backboard shall be marked with a 2" white rectangle centered behind the ring. This rectangle shall have outside dimensions of 24" horizontally and 18" vertically.


Give you 10 example of future tense?

will/shall run will/shall walk will/shall talk will/shall shout will/shall eat will/shall die will/shall cry will/shall arrive will/shall attack will/shall antidisestablishmentarianism