answersLogoWhite

0


Best Answer

For single family home construction, the stages are as follows:

clear site, set form boards, underground Plumbing/hvac/electric, foundation makeup (hardware, mesh, sand, etc), pour concrete, framing, windows, hvac rough, plumbing topout, electric rough, low-volt rough, dry-in, roofing, insulation, stucco, drywall, garage door, trim carpentry, paint, cabinets, countertops, hard flooring, trims-(hvac, plumb, electric, and low-volt), drywall/paint touchup, carpet, final grade, landscape.

This is obviously not a comprehensive list....inspections, municipal requirements, deliveries, local building specs, etc., will cause variances. This is a good general list, though, from someone who has done homebuilding training for builders nationwide.

User Avatar

Wiki User

12y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

12y ago

For construction of dam first we have to visit the dam site, For knowing the topography of land, nature of ground, type of rocks present, rainfall intesity in that area, type of soil. All this should be known to us before starting the work. After that surying and levelling is done to start further work

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What are the stages of dam construction?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

The role of the coffer dam in the construction of a dam?

coffer dam


When did the construction of the Pati dam start?

The construction of the Pati Dam began during 1996-1997.


Name of dam built on riverNiger?

Markala Dam Kainji Dam Kandadji Dam (currently under construction)


Which is aided Tehri dam construction?

Teheri dam ;encyclopedia,Wikipedia


What is the oldest dam in Pakistan?

Currently operational? The Jari Dam at 84 meters, completed in 1967. the Tarbela Dam is the largest earth filled dam in the world and is second largest by the structural volume. The Mirani Dam is the largest dam in the world in terms of volume for flood protection. There are several damn projects currently under construction or in pre-planning stages so the above will change at some point in the near future.


What were some of the Innovations that made the construction of the Hoover dam?

Some of the innovations that made the construction of the Hoover Dam possible is.....................................................................................................................................................................................................................................................................................................................................................................................................................GO AND DO YOUR MOM!


What year was the consruction started for conowingo dam?

Construction of the dam started in 1926.


One successful public works project begun under president Hoover was the?

Construction of a major dam on the Colorado River.


When was the colebrook dam built?

The construction of the Colebrook River Dam began in May 1965. Construction on the dam was finished in June 1969. It cost a total of $14.3 million dollars to complete.


Is the Hoover Dam construction finished?

yes


How was lake mead held back during the construction of the Hoover Dam?

Lake Mead is formed by the dam; until the dam was finished, there was no Lake Mead to hold back. The river was diverted during the construction.


When did construction of the Hoover Dam Bypass start?

2004