You will need a minimum of 3.56 cubic yards.
8.64 cubic yards of cement.
You will need 6.17 cubic yards of cement.
At 4" deep, a 13' x 19' area needs at least 3.05 cubic yards of cement.
You will need a minimum of 7.41 cubic yards.
You will need 27.6 cubic yards of cement.
1.85 cubic yards of cement.
8.64 cubic yards of cement.
1,152 cubic feet.
You will need 6.17 cubic yards of cement.
12.96 yards
This is a volume requiring 11.1 cubic yards of cement.
At 4" deep, a 13' x 19' area needs at least 3.05 cubic yards of cement.
5.93 cubic yards.
Thickness? Do you mean cement or concrete - cement is the binder/adhesive in the concrete.
13*13*6=1014 yards of cement
A 16' x 8' by 4" slab requires 3.56 cubic yards of cement.
You will need a minimum of 7.41 cubic yards.