answersLogoWhite

0


Best Answer

To draw a hysteresis curve in an Excel document you need to choose chart under the Insert tab, specifying a scatter chart. Then you will specify your data, which should be listed in columns in an Excel document. You can add the trend curve by selecting the Chart tab and going through the options offered.

User Avatar

Wiki User

9y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How do you draw hysteresis curve using excel graph?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is a sentence using the word graph?

The graph showed the results from his experiment. You can graph the data points to see what type of curve your equation defines.


How many stress values can be found in stress strain curve?

An infinite amount... for any given Strain, there is a corresponding Stress value. To see what I mean, plot a Stress Strain graph in excel using 10 sets of values, then do another using 20... the one with 20 has a smoother curve, see where I'm coming from?


How do you draw a sublimation curve?

Using a triple point phase diagram or "line graph chart" with temperature and pressure on the outsides then draw the reaction.


What is the difference between a line graph bar graph and pie graph?

Line graph- two axis, plot the graph with each points (e.g 2,4) and join them up with a straight or curve line Bar graph- Drawn using bars Pie graph- circle of 360 degrees and divide each section measured according to the given value


How can hysteresis loss in magnetic material may be reduced?

Hysteresis losses depend on the type of metal used to manufacture the magnetic circuit of a machine. Most magnetic circuits are made from silicon steel. Generally speaking, there's not much you can do to reduce hysteresis losses as that has already been factored in by the machine's designer.


How do you add a secondary Y axis to a line graph in Excel?

Unfortuately this is impossible in MS office. Try using other plotting program i.e. gnuplot


How to calculate the gradient from the non linear graph?

Draw a tangent to the curve at the point where you need the gradient and find the gradient of the line by using gradient = up divided by across


What is the insert chart for in excel?

When reporting data or to get a better idea of what direction your company is heading, a graph is the easiest way to get a quick understanding of the data in front of you. Create a graph onto your Excel spreadsheet using three data sources, the date, total amount due, and total amount due greater than 60 days.


Producers can use a production possibilities frontier for what purposes?

A production possibilities frontier, or PPF, is a curve graph which shows combinations of two or more goods or services. The graph shows these goods or services being produced while using a maximum amount of resources.


What does daverage do in Excel?

It calculates an average from a database list in Excel, using specified criteria.It calculates an average from a database list in Excel, using specified criteria.It calculates an average from a database list in Excel, using specified criteria.It calculates an average from a database list in Excel, using specified criteria.It calculates an average from a database list in Excel, using specified criteria.It calculates an average from a database list in Excel, using specified criteria.It calculates an average from a database list in Excel, using specified criteria.It calculates an average from a database list in Excel, using specified criteria.It calculates an average from a database list in Excel, using specified criteria.It calculates an average from a database list in Excel, using specified criteria.It calculates an average from a database list in Excel, using specified criteria.


What is a graph that displays data using line segments?

The graph that displays data using line segments is a line graph.


Derivation of demand curve using the indifference curve approach?

The derivation of an individual consumer demand curve can be done using the indifference curve approach. This is done by preparing the demand schedule of a consumer from the price consumption curve.