It takes approximately 8 months to build a 737. Boeing is increasing production at present, with the -800 model.

User Avatar

Wiki User

10y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How long does it take Boeing to build a 737?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How many days does it take to build a new Boeing 737?

3 days


How long does it take to assemble a Boeing 737?

3 days


How long does it take on an average to build a Boeing 737 from scratch?

It takes with all the matterials about four years, so from scratch it would take around seven years.


How long is a Boeing 737 900?

The Boeing 737-900 is 138 ft. 2 in. (42.1 meters).


Boeing 737 take off and landing speed?

Take-off speeds for the Boeing 737 range between 130 kts and 160 kts Landings speeds for the Boeing 737 range between 110 kts and 170 kts.


What type of aircraft does air Alaska use?

Assuming you mean Alaskan Airlines, their fleet consists of: Boeing 737-900 Boeing 737-900ER Boeing 737-800 Boeing 737-700 Boeing 737-400 Boeing 737-400 Combi Bombardier Q400 Bombardier CRJ-700


Where is the Boeing 737 built?

The Boeing 737 is assembled in Renton, WA


How long can a Boeing 737 fly for?

11 hrs at max


Which was the first version of the Boeing 737 to be put into production?

Boeing 737-100


How much bigger is the Boeing 747 than the Boeing 737?

The Boeing 737 is approx (depending on wich version) 42.1 m long, and the Boeing 747 approx (depending on wich version too) is 76.4 meters long. The biggest Boeing 737 can seat up to about 190 people, and the biggest Boeing 747 can seat up to about 600 people. The 747 is a long haul aircraft which usually takes around 350 passengers; the 737 is a short haul aircraft which usually takes around 120 passengers.


How long can a 737 fly?

A Boeing 737 fully loaded with fuel and passengers and cargo can travel 4,444 nm.


What is the maximum take off weight for the Boeing 737?

172,500 lbs