It took Nehemiah 52 days to rebuild the walls of Jerusalem. Nehemiah 6:15 (Holman Christian Standard Bible)
15 The wall was completed (A) in 52 days, on the twenty-fifth day of the month Ellul. (B)
25 years
100 Days, or 2400 Hours.
two walls are 4m * 3m And Two walls that are 5.5m * 3m A = 2(4*3)+ 2(5.5*3) A= 2*12 + 2*16.5 A= 24+33 A= 57
The length times the height of the wall will give you the square footage of that wall. Do that for both the long and short walls, and multiply the result by two. If the room is square, just measure one wall, find the square footage, and multiply by four. Don't forget to measure the length and height of any doors and windows, and subtract the total from the area of the walls.
Measure the room diagonally from one corner to the other.do this again on the other diagonal. If the room is square then both measurements will be the same assuming that all four side(walls) are the same length Not all four side walls need to be the same. As long as the walls opposite each other are the same length (a square or rectangular room) then the above answer works.
It took Nehemiah 52 days to rebuild the walls of Jerusalem. Nehemiah 6:15 (Holman Christian Standard Bible) 15 The wall was completed (A) in 52 days, on the twenty-fifth day of the month Ellul. (B)
The walls surrounding Jerusalem were planned and built by Nehemiah and Ezra. They are 2.4966 miles long, 39.37 feet high and surround the old city of Jerusalem. The average thickness of the walls is 8.2 feet. Thirty-four watchtowers and eight gates are part of the structure.
4 years
25 years
3 days
70 years
yes, but not for long. The cylinder will get gas washed and score the cylinder walls as well as gas wash the rings. You will need an engine rebuild.
they need money to rebuild and i do not konw
Thirty days. The siege beforehand lasted two and one-half years.See also the Related Link.More about the Destruction
about 2 years
3years?
The City of York walls are arround 2.5 miles long