A water meter that says no load test means one thing. The thing that it means is iron loss.
There is one thing that watt-meter indicates of blocked rotor test. That is the voltage flows and in blocked rotor test.
Yes; that is the principle used in no-load tests on transformers. The current in the copper windings is zero on the secondary and low on the primary, so the copper loss is negligible.
In general, you can install a wattmeter on the primary or the secondary side of a transformer (it depends what you are trying to measure). But if you are conducting an open- and short-circuit test (to find the transformer's losses), then the wattmeter is connected to the primary side because you want to measure the total (primary + secondary) losses and that is only achievable from the primary side.
2.5 times of design load
in this test their is a no load on dc shunt motor so it is an indirect test
There is one thing that watt-meter indicates of blocked rotor test. That is the voltage flows and in blocked rotor test.
In case of open circuit test of transformers we measure iron losses and hence the power lost here is being measured by the wattmeter.
If, by 'upf', you mean 'unity power factor', then allwattmeters measure the in-phase component of the load current, so the term is quiet unnecessary.A short-circuit test is used to determine the (true) power loss in the transformer, which is exactly what a wattmeter measures
In case of no load only magnetizing current is flowing which is somewhere around 75 degree out of phase and so the power factor is very low.
Yes; that is the principle used in no-load tests on transformers. The current in the copper windings is zero on the secondary and low on the primary, so the copper loss is negligible.
There is no such thing as a "Blocked" Rotor test so that must be a misunderstanding of the correct description, which is "Locked" Rotor test.For more information see the answer to the Related Question shown below.
POST (in uppercase) refers to the power-on self-test; the message might indicate a failure with some of the computer's hardware.
In general, you can install a wattmeter on the primary or the secondary side of a transformer (it depends what you are trying to measure). But if you are conducting an open- and short-circuit test (to find the transformer's losses), then the wattmeter is connected to the primary side because you want to measure the total (primary + secondary) losses and that is only achievable from the primary side.
The initial load in Rockwell hardness test is 10KGf.
You can take it to a battery place and they can test it under a load.
dc motors can be operated at no load as well as at load condition.But by using the swin burns test the efficiency can be calculated at no load which is more benficial than load test.At industries this swin burns test is used because for load test we have to give separate supply for the load to run.In no load test that power is saved.
example of static load test