, its all wrong. In the matrix structure, the personnel and other resources that a project manager requires are not permanently assigned to the project, but are obtained from a pool controlled and monitored by a functional manager. Personnel required to perform specific functions in a particular project are detailed for the period necessary, and are then returned to the control of he functional manager for reassignment. Discipline supervisors are responsible for the efforts of the groups constituting assigned project personnel and for other required resources. The members of the groups and their supervisors are charged with the timely completion of the different tasks and are responsible to the project manager and the functional manager.

Example: An engineer assigned for a specific period to design a subsystem of a project is responsible to the functional manager for completing the task as scheduled, and to the project manager for providing an acceptable design. The two managers report to a matrix executive.

The project manager in the matrix works with the functional manager to establish the resource requirements and their timetable utilization on the project, and to work out the revisions required as the project effort proceeds. The functional manager is responsible for assuring that resources are utilized in the manner best serving the interests of the organization. The formal role of the matrix executive or top-level management is similar to the top subordinate to the position. The general manager is literally on top of or outside the basic matrix structure and therefore should have a clear perspective of all activities and personnel within the matrix. Here, however, the similarity ends. The general manager leads a dual command structure, the functional and the project hierarchies, which must be balanced through a careful blend of autocratic and cooperative managerial styles. Participation is required, for example, in the arbitration of technical disputes and in resource allocations. Autocracy is essential to the establishment, enforcement, and revision of priorities among and between the functional and project entities within the matrix. This role involve the three major managerial concerns:

· balancing power - The balance of power involves allocating both project and functions budgets, orchestrating personnel assignments, and applying schedule pressures and others.

· managing the decision context- Management of the decision context is accomplished by establishing strategy, policy, and control systems to assure that decisions are made to benefit the overall organization rather than the individual functional department or project.

· setting standards - High performance standards start at the top. They must established and enforced by the general manager, since his is the only position in the matrix with the perspective and power to require top quality performance.

Advantages of the matrix organization

· It attempts to retain the benefits of both structures ( functional organization and project team structure ).

· Coordinates resources in a way that applies them effectively to different projects.

· Staff can retain membership on teams and their functional department colleagues.

Disadvantages of the matrix organization

· Potential for conflict between functional vs. project groups.

· Greater administrative overhead.

· Increase in managerial overhead

User Avatar

Wiki User

12y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What advantages and disadvantages of matrix organisational structure?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the difference between a matrix structure and a organisational structure?

the difference between an organisational structure and a matrix structure is that a matrix structure is a combined structure whereas an organisational structure is in a vertical order and has different levels.


What type of organisational structure does a kingfisher have?

matrix structure


wh matrix organisational structure?

a bone


What is nikes organisational structure?

Matrix structure or flat strucure!


VIEW ORGANISATIONAL STRUCTURE USED BY PHILLIPS COMPANY?

MATRIX


Advantages and disadvantages of matrix?

There are many advantages and disadvantages of having and making a matrix. One advantage is the layout of the information.


What type of organisational structure does nike use?

a so called matrix organization structure


Characteristics of typical matrix organisation structure?

a tall organisational stuture


What is the organisational structure of Reliance group of industries like matrix organisational structure etc.?

Organisational structures are diagrams that show the relationships between different employees. that is the job roles of the employees in the business


Advantages and disadvantages of SPACE Matrix?

secret


What is the matrix structure?

An organisational structure that puts managers into project teams that cut across functional or departmental lines. Matrix structures usually get quicker results faster than other groups.


What is matrix organizational structure and what are its advantages and disadvantages?

A matrix organization is organized into functional departments, but a project is run by a project team, with members coming from different functional departments. On the spectrum of a project manager's authority, matrix organizations are in the middle of two extremes: functional and projectized organizations.