answersLogoWhite

0


Best Answer

It began as a big concentration camp, mainly for Poles and was extended in stages. Auschwitz I used existing buidlings to a large extent and most of it was in use in 1940. Auschwitz II (Birkenau) was built in 1941-42 and Auschwitz III (Monowitz) in 1942.

Several sub-camps (about 35) were added.

User Avatar

Wiki User

14y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

11y ago

Construction continued until it was evacuated.

This answer is:
User Avatar

User Avatar

Wiki User

15y ago

It was built in stages, starting in May 1940.

This answer is:
User Avatar

User Avatar

Wiki User

12y ago

It took 7 months to build the 3 main camps and several subcamps, more subcamps was developed during the Auschwitz camp existance

This answer is:
User Avatar

User Avatar

Wiki User

11y ago

The auschwitz death marches were a total of 60km

This answer is:
User Avatar

User Avatar

Wiki User

11y ago

it was instant, there was no resistance to the liberating Soviet forces.

This answer is:
User Avatar

User Avatar

Wiki User

11y ago

construction and expansion never stopped in the four years that Auschwitz operated.

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How long did it take to build Auschwitz?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Why was the Auschwitz camp build?

it was build to murder people


How long did it take to build Asimo?

how long does it take to build a asimo


When were Auschwitz concentration camp build?

1939


How long did it take to build the haif moon?

how long did it take to build the half moon


How long did it take to build the Scottish parliment?

how long did it take to build the scottish parliment?


How long did it take to build Cabot tower?

how long did it take to build cabot tower


When was Auschwitz build?

the concentration camp was built in 1940.


How long did it take Anne Frank to get from Westerbork to Auschwitz?

Anne Frank was at Auschwitz for approximately 7-8 weeks. According to records, she arrived at Auschwitz at the beginning of September, and was transported to Bergen-Belsen at the end of October.


How long will hs2 take to build?

hs2 will take 15 years to build


How long does it take to build Beam bridge?

how long does it take to build a beam bridge of 2400 sq ft


How long did it take to build deeping St. James church?

How long did it take to build st James cathedral london


How long did it take to build the canton tower?

it took 3 years