No one actually knows because it was not our planning, t was Osama bin Laden. But for me i think it took alot of planning because of all the distruction they made in the 911. They carefully planned it.
According to the Germans, they planned for the Schlieffen Plan to take 6 weeks. The Schlieffen Plan was Germany's plan to invade France through Belgium. Hope this helps!
It took 9 years. It started in 1897 and presented in 1905. It was not until 1906 that the plan was executed which was stuffed up by Moltke.
a long time Plan was conceived in the Spring of 1943, the actual escape to place on March 24-25, 1945.
It took approximately a year to plan D Day. General Eisenhower was put in charge of planning after the invasion of Sicily and he sped up the process.
10 years sense the twin towers got hit my an airplane this happen in 2001
99 days
6-8 months
I dont know. Why you asking me?
Not by the US government.
The 2011 Porsche 911 is 14 ft. 7.6 in. (175.6 in.) long.
The 2007 Porsche 911 is 14 ft. 7.6 in. (175.6 in.) long.
The 2012 Porsche 911 is 14 ft. 7.6 in. (175.6 in.) long.
The 2004 Porsche 911 is 14 ft. 6.5 in. (174.5 in.) long.
The 2010 Porsche 911 is 14 ft. 7.6 in. (175.6 in.) long.
The 2013 Porsche 911 is 14 ft. 8.8 in. (176.8 in.) long.
The 2001 Porsche 911 is 14 ft. 6.5 in. (174.5 in.) long.
The 2009 Porsche 911 is 14 ft. 6.6 in. (174.6 in.) long.