Multiply 9*16 to see how much it would measure in square meters. Then, multiply it by 1.25 which is the cost of each square meter.
Multiply 9 by 16. This will give you the number of square meters.
Than multiply the number of square meters by $1.25.
This will give you the cost.
0.093 square meters is equal to one square foot.
The cost would be ($25) multiplied by (the number of square meters to be carpeted).
If a square foot is 9 then a square meter will be 9*10.9 = 98.1
(13m x 17m) x (27.80/m^2) = 6,143.80
Cow grass can cost between $1.90 and $7.00 per square meter. Many places will only allow orders by 100 square meter or 1000 square meter increments.
5*1.5 = 7.5 units.
Any where from 15.00 per square meter up to $50.00 per square meter. Thus for a 3000 Square Meters [13mm polyurethane surface] 3000 square meters can cost $150,000.00. The more surface area and higher quality materials may cost more.
0.093 square meters is equal to one square foot.
1044. you have 29sq meters, x 39 per sq meter = 1044
The cost would be ($25) multiplied by (the number of square meters to be carpeted).
To calculate the price per square meter, divide the total price by the total number of square meters. For example, if a piece of cardboard with an area of 10 square meters cost 5 dollars, the price per square meter would be (10 m2)/($5), which comes out to be 50 cents per square meter.
If a square foot is 9 then a square meter will be 9*10.9 = 98.1
120 dollars
The cost per linear meter is the cost per square meter times by the width of the roll.
Cost of 1 square meter: 1,150,000/15,013 = 76.60027976 or 77 rounded
Concrete is sold in cubic (volume) measurements not square (area) measurements.
(13m x 17m) x (27.80/m^2) = 6,143.80